งานติดตั้งไฟฟ้า (Electrical Work)
-
2014 : Installation of dyno control panel for engine test bench
Control board for engine dyno test bench
-Inverter control system
-Weighting 2,500 kgs.
-Cable route & wiring & connection -
2014 : Installation of Fuel supply control system
Scope of work ;
-Design fuel supply control panel
-Installation power and control cable
-Start up and Commissioning -
Installation of Grounding for chassis dynamometer system
Scope of work ;
-Install ground loop.
-Precision ground resistance < 5 ohm.
-
Main feeder panel
Install panel
Wiring and connection cable
Assit. commissioning